A construction loan pays for your build in stages, not in one lump sum. If you work with data, think of it as a pipeline. Lenders typically release money in stages and often want evidence, such as a progress inspection, before each release, depending on the lender.
That staged release shapes everything else: when you start repaying, how much interest you pay, and what your builder's contract needs to say. This article walks through those moving parts in plain language.
How Does a Construction Loan Work?
A construction loan releases money to your builder in stages as work is completed, and you generally pay interest only on the amount drawn so far. This differs from a standard home loan, where the full amount is paid out at settlement.
The usual flow starts with land settlement, then a deposit to the builder, then payments at stages such as base, frame, lock-up and fixing. Before each payment, the lender will typically want evidence the stage is done, often through a progress inspection. Each lender sets its own rules on how many drawdowns it allows, how long the build can run and what fees apply, so it pays to compare lenders before you sign a building contract.
The trade-off is that early in the build you carry less debt, but later payments are usually larger (for example, lock-up is 35 per cent in Victoria's all-stages schedule) and you will need cash flow to cover costs that fall outside the loan.
What Does the Progress Payment Schedule Look Like?
A progress payment schedule is the list of stages in your building contract, with the portion of the price due at each one. The rules for it vary by state and territory.
As an example, Victoria's usual schedule for a contract to build all stages is 10 per cent at base, 15 per cent at frame, 35 per cent at lock-up and 25 per cent at fixing, for contracts before 31 March 2027. Victoria is changing its rules from that date, so check the current version with your builder. In NSW, payments must match work actually carried out. In WA, they must be genuine payments for work already performed or materials already supplied.
Deposit limits also differ. NSW caps deposits at 10 per cent, while Queensland and South Australia cap them at 5 per cent for most contracts of this size. Paying early or paying more than the contract allows can weaken your insurance protection, so ask your lender and builder to match the contract to the loan stages before you sign.
Ready to get started?
Book a chat with a Finance & Mortgage Brokers at Tech Home Loans today.
Do I Pay Principal and Interest During the Build?
During a build you are usually charged interest on what has been drawn, and some lenders offer interest-only repayments for this period. The exact option depends on the lender.
NSW Government guidance says a borrower financing a project home must start repayments once the first progress payment is made and the loan begins to be drawn. Check any special requirements with your lender. If you later move to principal and interest, repayments are worked out over the shorter remaining term, so they are higher than if the same balance were spread over the full term.
Here is an illustrative example at 6.75% p.a., which is not a current offer. Say the loan has drawn down $400,000 by the end of the build. Interest alone is about $27,000 a year, or about $2,250 a month. If that balance then moves to principal and interest over 30 years at the same rate, the repayment is about $2,594 a month. The extra money pays down the loan, but your monthly cash flow rises. Use a repayment calculator to test your own numbers, because the real rate depends on your deposit size and lender.
How Do I Stage the Money? A Worked Example
Staging the money well means matching each loan drawdown to a builder invoice so no stage is paid from your own pocket unexpectedly. Here is an illustrative example.
Consider a data engineer who has bought land and signed a fixed price building contract. Her situation: the contract has five payments, and the lender will release funds after each inspection. The problem: the frame payment falls due before the inspection report arrives, so there is a gap of a few days. The solution: she asks her broker to confirm the lender's inspection timing, then asks the builder to issue the invoice only after the stage is complete and inspected. She also keeps a small cash buffer for items outside the contract.
The outcome: each invoice is paid from a drawdown, interest is charged only on the amount drawn, and she is not forced to use savings to bridge a timing gap. The trade-off is that she needs a buffer set aside, which ties up money she could have used elsewhere.
Fixed Price or Cost Plus Contract: Which Fits a Loan?
A fixed price building contract usually suits a construction loan because the total cost is known up front. A cost plus contract leaves the final price open, and how lenders treat cost plus contracts varies, so confirm this with your lender.
The lender uses the contract price to set your loan amount, and the total debt, including undrawn funds, counts toward its loan-to-valuation ratio. A fixed price contract gives a clear number. The trade-off is that variations, such as upgrades after signing, may need extra funds from you. With a cost plus contract you may have flexibility on materials, but the cost can rise.
If your income includes RSUs or bonuses, see our page on using RSUs and bonuses as genuine savings, as lenders treat this kind of income in particular ways. APRA says a prudent lender would apply discounts of at least 20 per cent to less stable income such as bonuses or overtime.
What Do Lenders Check Before Approving a Build?
Lenders check that you can afford repayments, that the plans and contract are sound, and that your builder is properly licensed and insured. Each lender sets its own documents and checks.
On affordability, APRA requires banks and similar lenders to assess new borrowers at an interest rate at least 3 percentage points above the loan rate. Your borrowing capacity will therefore be tested against a higher figure than your actual repayments. The debt-to-income limit does not apply to finance for building new homes, but the serviceability test still does.
Expect questions about your council approval, building plans and the registered builder. For builder protection, several states require home warranty or indemnity insurance before the builder can ask for payment. For land and build packages, see our guide to house and land package loans.
Can Grants and Schemes Help You Build?
Some first home buyers can claim a grant or concession when building, but amounts and caps differ by state and territory. The rules also change, so confirm the current details with your state revenue office.
For example, Revenue NSW lists a $10,000 first home owner grant, and for vacant land with a building contract the combined value of the land, contract and any variations must not exceed $750,000. Housing Australia lists house and land packages as supported under the 5% Deposit Scheme, subject to price caps and eligibility. Our page on the 5% deposit scheme has more detail.
If you plan to rent the home out, tax rules on interest and capital works deductions apply. Speak with your accountant before you decide, as outcomes depend on your circumstances.
Where Do Renovations Fit In?
A major renovation may also be funded in stages, but lender treatment of renovations varies, so confirm the details with your lender.
If you are extending rather than building from scratch, read our guide to renovating your house. For the full overview of building finance, see construction loans for tech industry workers.
If you want to map your build to a loan, call one of our team or book an appointment at a time that works for you. We can compare construction loan options from lenders across Australia and line up the drawdowns with your builder's contract.
Frequently Asked Questions
Do I pay interest on the whole construction loan from day one?
Usually you pay interest only on the amount drawn so far. Repayment rules during the build vary by lender, so confirm yours before signing.
How are construction loan payments made to the builder?
Funds are released in stages, such as base, frame, lock-up and fixing. Lenders often want evidence of each stage, such as a progress inspection, first.
Is a fixed price contract suited to a construction loan?
A fixed price contract usually suits lenders because the total cost is known. The trade-off is that upgrades after signing may need extra funds from you.
Can I get a first home owner grant if I build?
Some buyers can, but amounts and caps differ by state and territory. Check with your state revenue office for current eligibility.