Construction Loan Features and How Drawdowns Work

A plain-English look at how construction loans pay your builder in stages, so you can compare features with confidence.

Hero Image for Construction Loan Features and How Drawdowns Work

A construction loan pays your builder in stages, and interest is charged only on the amount drawn so far. Your lender sets the repayment type during the build, and fees may also apply.

For a cyber security engineer, that logic will feel familiar. It works like staged access: funds are released at checkpoints, each one verified before the next opens. This article walks through the features that matter when you compare loans, and the trade-offs that come with them.

How Does a Construction Loan Work?

A construction loan releases money to your builder in stages as work is completed, rather than as one lump sum. Lenders set the exact terms, including the number of drawdowns, the repayment type during the build, time limits, inspections, fees and rates.

The loan limit is agreed upfront, but the balance owing starts small and grows with each payment. That keeps early interest charges lower than they would be on a fully drawn loan. NSW Government guidance says a borrower financing a project home must start repayments once the first progress payment is made and the loan begins to draw down. Ask your lender how this works for your loan before you sign.

The trade-off is that repayments rise as the build moves along, so your budget needs to allow for the finished balance, not the starting one.

What Is a Construction Draw Schedule?

A construction draw schedule lists the building stages at which your lender releases money to the builder. Typical stages are base, frame, lock-up, fixing and completion, though the names and number vary by contract and lender.

State laws shape these payments. In Victoria, for a contract to build all stages, the usual schedule is 10 per cent at base, 15 per cent at frame, 35 per cent at lock-up and 25 per cent at fixing. Consumer Affairs Victoria says a different schedule needs legal advice. Other states set their own rules, so check the one where you are building.

Some lenders may require an inspection or valuation before a drawdown, so ask your lender. You may also choose to commission your own inspection. In NSW, Building Commission NSW gives $250 to $500 as an indicative cost for each progress inspection. Ask your lender who pays for inspections and whether fees apply to each drawdown.

Ready to get started?

Book a chat with a Finance & Mortgage Brokers at Tech Home Loans today.

Why Interest Is Only Charged on the Amount Drawn

During the build, interest is charged on the amount drawn down so far, not on the full loan limit. This is one of the most useful features of a construction loan.

Consider a buyer building a home on land they already own. Say the loan limit is $600,000 and the first payment releases $60,000. At the illustrative rate of 6.75% p.a., interest on $60,000 for a year is about $4,050, or roughly $337 a month. If the whole $600,000 were drawn, interest only would be about $40,500 a year, or roughly $3,375 a month. As each stage is paid, the monthly figure climbs towards that higher number.

That $3,375 is an interest-only figure. Once the loan moves to principal and interest, repayments will be higher, for example about $3,890 a month on $600,000 at 6.75% over 30 years. This is an illustration at an illustrative rate only.

In this scenario, the buyer plans for the higher repayments from day one. They use a repayment calculator on the full amount, set aside the gap between early and later repayments, and are ready when the last payment is released. The trade-off is that rate and fees depend on your lender and deposit size, so compare the full cost rather than the rate alone.

Interest-Only During the Build: Pros and Cons

Some lenders offer interest-only repayments during construction, which keeps repayments lower while the build is underway. Others may set different rules, so confirm the repayment type before you apply.

The cost is that you are not reducing the principal while paying. When the loan moves to principal and interest, repayments are assessed over the shorter remaining term. Our page on interest only loans for tech industry workers explains this in more detail.

How Do Lenders Assess Your Borrowing Power for a Build?

Lenders assess a construction loan using the same serviceability rules as other home loans. Under APRA rules, banks must test that you can meet repayments at a rate at least 3.0 percentage points above the loan rate. APRA confirmed this buffer was unchanged on 28 May 2026.

If your income includes bonuses or equity pay, lenders may discount it. APRA refers to discounts of at least 20 per cent for less stable income such as bonuses or overtime. Lenders set their own treatment of equity pay such as RSUs. Our guides on using RSUs and bonuses as genuine savings and borrowing capacity show how this works for tech pay packages.

Finance for building new dwellings is exempt from APRA's debt-to-income limit, but that does not remove the serviceability test.

Fixed Price Contracts and Progress Payments: Check Before You Sign

A fixed price contract states a contract price, which can still change through variations, provisional sums and prime cost items. A cost plus contract is based on actual costs plus a margin. Your lender will want to see the contract, and that affects how the loan is structured.

Deposit and payment limits vary by state. In NSW the maximum deposit is 10 per cent, and in Queensland it is 5 per cent for contracts of $20,000 or more. In Western Australia it is 6.5 per cent for contracts from $7,500 to $500,000. Payments must also match work actually done.

Here is a second scenario. A buyer signs a contract in Queensland and a builder asks for a large payment before the slab is poured. The buyer checks the schedule against the lender's draw stages, sees that the claim is well ahead of the work, and raises it before paying. Queensland rules say payments must be relative to the work completed, and early payments can reduce protection under the Queensland Home Warranty Scheme. The builder corrects the claim, and the loan release lines up with the actual progress.

The trade-off is time. Checking each claim takes effort, but it protects both your money and your insurance cover.

Which Construction Loan Option Suits Your Build?

The right option depends on your build type. A land and build loan, house and land package, or owner builder arrangement each carries different paperwork and lender requirements.

If you are buying a package, see our page on house and land package loans for tech industry workers. For a broader overview, read about construction loans for tech industry workers. Lenders generally set their own requirements for plans, approvals and the building contract, so confirm them with your lender.

We can compare construction loan options from banks and lenders across Australia, so you are not limited to one lender's rules. We walk you through the terms in plain language and flag any fees, such as progressive drawing fees, before you commit.

Frequently Asked Questions

Do I pay interest on the full construction loan amount?

No. During the build, interest is charged only on the amount drawn down so far. Your lender sets the repayment type during the build, and fees may apply. Repayments rise as more stages are paid.

What is a construction draw schedule?

It is the list of building stages at which your lender releases money to your builder. Stages and amounts depend on your contract, state rules and lender.

Can I have interest-only repayments during construction?

Some lenders offer this, but terms vary. Interest-only keeps repayments lower during the build, though you are not reducing the principal.

Does the debt-to-income limit apply to construction loans?

Finance for building new dwellings is exempt from APRA's debt-to-income limit. Lenders must still assess whether you can afford repayments.